EUN storage systems are implemented with maximum efficiency in the Mollet del Vallés Judicial Building

EUN solutions in the Judicial Building of Mollet del Vallés, belonging to the Justice Department of the Generalitat de Catalunya, with the aim of managing their archive with maximum storage capacity and an agile and secure documentation management.

The modular design and the adaptability of our storage systems to the architectural space have been the key to achieving an optimal distribution of the elements and thus maximizing the storage capacity in a space that was previously built and equipped.

The characteristics of the existing facilities and architectural elements on site have been integrated into the project: air conditioning system, fire prevention system, pillars, access doors, corners and angled areas. In addition, the project had to include the layout of access to the Depository of Pieces of Conviction with the least loss of space.

 

 

Taking advantage of the height of the systems, the storage capacity obtained with EUN's mobile systems must be highlighted. More than 330 cm. high, 10 storage levels and superior anti-tip systems to guarantee the safety of the people who use the systems.

For more information about our solutions applied in the Justice and Public Administration sector, contact us: info@eungroup.com.

Contact Us

We are pleased to respond to any question related to our products and services.