EUN’s systems fitted out in the new courthouse in Segovia

The 610 and 620 ranges of storage systems have been installed in the recently opened building’s storage space
The new courthouse in Segovia will be able to accommodate the various branches of the justice system on a total of 12,200 m2 of floor area.
|
The perfect use of the space led to the construction of 4,549 linear metres for the storage of all of the paperwork required by the courts, such as evidence for the prosecution and documents from registry offices.